FAQ

We know you have questions about our agency. That’s why we’ve rounded up the most popular ones and answered them in detail.

Asphalt Paving

Paving is a general term that refers to the process of covering a surface, such as a road, driveway, or walkway, with a durable material to create a smooth, flat, and stable surface. It can be done using various materials, including concrete, bricks, stones, or asphalt. Asphalt, on the other hand, is a specific type of paving material. It is a mixture of aggregates (like sand, gravel, and crushed stone) and a binder (asphalt cement) that holds the aggregates together. Asphalt is known for its durability, flexibility, and ability to withstand heavy traffic, making it a popular choice for roads and driveways.
Yes, asphalt is generally cheaper than concrete for paving roads and driveways. Asphalt typically has lower initial costs and is quicker to install, making it a more cost-effective choice for many projects. However, asphalt may require more frequent maintenance compared to concrete.
Asphalt and blacktop are similar but not identical. Both are made from a mixture of stone and bitumen, but the key difference lies in their composition and use. Asphalt contains a higher percentage of bitumen, making it more durable and suitable for high-traffic areas like highways. Blacktop has less bitumen and more crushed stone, giving it a smoother texture, which is ideal for driveways and residential roads.
Asphalt pavers typically last between 15 to 20 years, depending on factors such as usage, climate, and maintenance. Regular maintenance, such as sealing and timely repairs, can help extend their lifespan.
Yes, asphalt is generally cheaper than pavers. Asphalt installation costs are typically lower due to the materials and labor involved. However, pavers can offer greater durability and design flexibility, potentially leading to lower maintenance costs over time. The choice between asphalt and pavers should consider both initial costs and long-term value based on your specific needs and preferences.

To determine if your driveway is asphalt or blacktop, consider the following:
1. Texture: Asphalt driveways typically have a smoother surface compared to blacktop, which tends
to have a more textured finish due to a higher proportion of stone in its mix.
2. Usage: Asphalt is generally used for high-traffic areas like highways due to its durability, while
blacktop is more commonly used for residential driveways and low-traffic areas.
3. Color: Both materials are black, but asphalt may appear slightly darker and shinier when new
compared to blacktop.

Asphalt paving is an excellent choice for many reasons:
1. Durability: Asphalt surfaces are highly durable and can withstand heavy traffic and various
weather conditions, ensuring a long-lasting solution for roads, driveways, and parking lots.
2. Cost-Effective: Asphalt is more affordable compared to other paving materials. Its installation
and maintenance costs are lower, making it a budget-friendly option.
3. Quick Installation: Asphalt paving can be completed quickly, minimizing disruptions to traffic and
daily activities.
4. Smooth Surface: Asphalt provides a smooth and safe driving surface, reducing noise and
improving fuel efficiency for vehicles.
5. Eco-Friendly: Asphalt is 100% recyclable, making it an environmentally friendly choice.
Reclaimed asphalt can be reused, reducing waste and conserving resources.
These benefits make asphalt paving a practical and efficient choice for various paving needs.

Concrete Contractors

Cement is a binding agent used in construction, primarily composed of limestone, clay, and other
materials. It acts as a glue when mixed with water. Concrete, on the other hand, is a composite material
made from cement, water, sand, and gravel or other aggregates. Cement is an ingredient of concrete,
which provides its strength and durability.

The three types of concrete details are:
1. Facts: Objective statements that can be verified as true.
2. Statistics: Numerical data used to support a point or argument.
3. Examples: Specific instances or cases that illustrate a broader concept or point.

Concrete is a composite material made of cement, water, aggregates (such as sand, gravel, or crushed
stone), and sometimes admixtures to modify its properties. It is widely used in construction due to its
strength, durability, and versatility. Basic knowledge includes understanding the mixing process, curing
time, and factors affecting its strength and longevity, such as water-cement ratio and proper placement
techniques.

Concrete is naturally gray due to the color of the cement and aggregates used in its mixture.

It is generally cheaper to buy cement than concrete. Cement is one of the main ingredients in
concrete, which also includes sand, gravel, and water. Purchasing concrete means you are paying for the
additional materials and mixing, making it more expensive.

Concrete is generally cheaper than cement on a per-unit basis. Cement is a component of concrete,
which also includes aggregates like sand and gravel. Therefore, concrete is more cost-effective for larger
construction projects.

If you don’t put gravel under concrete, it can lead to poor drainage, causing water to accumulate and
weaken the concrete over time. This may result in cracks, uneven settling, and reduced durability of the
concrete surface. Gravel provides a stable base and helps with drainage, ensuring the longevity and
integrity of the concrete.

Asphalt Sealcoating

You should stay off asphalt for at least 24-48 hours after sealing to allow it to cure properly. This time
can vary based on weather conditions and the specific sealant used.

Sealing your driveway helps protect it from weather damage, oil spills, and wear. It’s recommended to
seal your driveway every 2-3 years. Before sealing, ensure the surface is clean and repair any cracks or
holes. Choose a high-quality sealer and follow the manufacturer’s instructions for best results.

In most cases, driveway sealers only require one coat. However, for older driveways or those with
significant wear, applying a second coat can provide extra protection and a more even finish. Always
check the manufacturer’s instructions for specific recommendations.

You can drive on asphalt 24 to 48 hours after sealcoating. This allows the sealcoat to cure properly and
ensures the best results.

The best time of year to seal an asphalt driveway is during late spring to early fall when temperatures
are consistently above 50°F (10°C) and rain is not forecasted. This ensures the sealant adheres properly
and cures effectively.

Asphalt sealer typically takes 24 to 48 hours to dry, depending on weather conditions such as
temperature and humidity. For best results, avoid traffic on the sealed area during this period.

If it rains after sealing your driveway, it may affect the curing process and lead to uneven or patchy
areas. It is recommended to allow the driveway to dry completely for at least 24-48 hours after sealing,
ideally during dry weather conditions. If rain is forecasted, it’s best to reschedule the sealing.

Excavation

Excavation is a crucial process in construction and archaeology, involving the removal of soil and rock
to create foundations, explore historical sites, or prepare for other construction activities. Key points to
know include:
1. Purpose: Excavation is used to prepare sites for building foundations, infrastructure, or to
explore and preserve archaeological sites.
2. Methods: Common methods include manual digging, mechanical excavation, and trenching.
3. Safety: Adhering to safety protocols is essential to prevent accidents and ensure structural
integrity.
4. Regulations: Compliance with local regulations and obtaining necessary permits is mandatory.
5. Environmental Impact: Minimizing environmental disruption and following sustainable practices
is important.

The most profitable excavation services typically include large-scale commercial projects, site
preparation for new construction, and specialized excavation like trenching for utilities. These services
often involve substantial contracts and require advanced equipment and skilled labor, leading to higher
profitability.

The main hazards in excavation include:
1. Cave-ins: The most common hazard, which can lead to fatalities and injuries.
2. Falls: Workers can fall into excavated areas or machinery can fall into the excavation.
3. Hazardous Atmospheres: These can include toxic gases, low oxygen levels, or flammable gases.
4. Water Accumulation: Can lead to drowning or create unstable conditions.
5. Utility Strikes: Contact with underground utilities like gas lines, water pipes, or electrical cables.
6. Proper safety measures and risk assessments are essential to mitigate these hazards.

The rule for excavation is to ensure safety, prevent damage to underground utilities, and comply with
legal requirements. Always locate and mark utilities before digging, use proper shoring and safety
measures, and follow local regulations and guidelines.

Before starting any excavation, you need to:
1. Obtain the necessary permits and approvals.
2. Conduct a site survey to identify underground utilities and potential hazards.
3. Notify relevant authorities and utility companies.
4. Develop a safety plan and ensure all workers are trained.
5. Set up appropriate site protection measures, such as barriers and signage.

Excavation refers to the process of digging, removing, and moving earth or other materials to create a
hole, trench, or cavity in the ground. This technique is commonly used in construction, archaeology, and
engineering projects to prepare sites for building, study historical artifacts, or install underground
utilities.

Service excavation involves the careful digging and removal of soil to install, maintain, or repair utility
services such as water, gas, electricity, and telecommunications. This process ensures that underground
infrastructure is properly placed and accessible for future needs, while minimizing disruption and
maintaining safety standards.

Road Construction

The basic principles of road construction include:
1. Planning and Design: Assessing the purpose, traffic load, and environmental impact to design a
road that meets all regulatory and safety standards.
2. Site Preparation: Clearing, excavating, and grading the site to create a stable foundation.
3. Subgrade Preparation: Compacting the soil and ensuring proper drainage to support the road
structure.
4. Pavement Layers: Constructing multiple layers, including the sub-base, base, and surface layers,
to provide durability and smoothness.
5. Quality Control: Conducting regular inspections and testing materials to ensure compliance with
specifications.
Maintenance: Implementing a maintenance plan to prolong the road’s lifespan and ensure safety.

Constructing a road is difficult due to several factors:
1. Planning and Design: Requires extensive surveys, environmental impact assessments, and
engineering plans.
2. Materials and Equipment: Needs high-quality materials and specialized machinery.
3. Labor and Expertise: Involves skilled labor for construction and maintenance.
4. Environmental and Legal Considerations: Must adhere to regulations and minimize ecological
impact.
5. Costs: High financial investment is necessary for resources, labor, and equipment.
These complexities make road construction a challenging and resource-intensive process.

The steps for constructing roads typically include:
1. Planning and Design: Assess needs, conduct surveys, and create detailed designs.
2. Clearing and Excavation: Remove vegetation and debris, and excavate the area to the required
depth.
3. Subgrade Preparation: Stabilize and compact the soil to create a strong foundation.
4. Base Layer Construction: Lay and compact a base layer of gravel or crushed stone.
5. Paving: Apply asphalt or concrete in layers, ensuring each layer is compacted.
6. Finishing: Add curbs, gutters, and road markings, then inspect for quality and safety.
These steps ensure a durable and functional road.

Road construction involves several key techniques, including:
1. Surveying and Planning: Mapping the terrain and planning the route.
2. Earthwork: Excavating and grading the soil to create a stable foundation.
3. Sub-base and Base Course: Laying down layers of materials like gravel or crushed stone for
stability.
4. Paving: Applying asphalt or concrete to form the road surface.
5. Compaction: Using heavy machinery to compact each layer for durability.
6. Drainage: Installing systems to manage water flow and prevent damage.
7. Finishing: Marking lanes, adding signage, and ensuring safety features.
These steps ensure a durable, safe, and efficient roadway.

The design elements of a road include:
1. Alignment: The horizontal and vertical layout of the road.
2. Cross-section: The arrangement of lanes, shoulders, and medians.
3. Pavement: The type and structure of the road surface.
4. Drainage: Systems to manage water runoff.
5. Signage and Markings: Road signs and surface markings for guidance and safety.
6. Roadside Elements: Features such as barriers, curbs, and lighting.
These components ensure the road is safe, functional, and durable.

Design in road construction involves creating detailed plans and specifications to ensure the road
meets safety, durability, and functionality standards. This process includes selecting the route,
determining the road’s dimensions, materials, and structural components, and planning for drainage,
signage, and environmental impact. Proper design ensures efficient traffic flow and long-lasting
infrastructure.

The timeline for building a road varies based on the project’s scope, location, weather conditions, and
other factors. On average, small roads can take a few months, while larger highways may require a year
or more. For a precise estimate, a detailed project assessment is necessary.

Parking Lot Paving

Most parking lots are paved with asphalt or concrete. Asphalt is commonly used due to its cost-
effectiveness, ease of installation, and durability. Concrete is another popular choice, known for its
longevity and low maintenance requirements.

The thickness of parking lot pavement depends on the expected traffic load and soil conditions.
Generally, a standard parking lot should have:
• Light-duty areas (cars only): 4-6 inches of asphalt or 4-5 inches of concrete.
• Heavy-duty areas (trucks and buses): 6-8 inches of asphalt or 5-7 inches of concrete.
For precise requirements, consult a professional engineer

The best parking pavement depends on various factors, including budget, climate, and usage.
Generally, concrete is preferred for its durability and low maintenance, while asphalt is popular for its
cost-effectiveness and ease of repair. For high-traffic areas, consider reinforced concrete. Consult with a
paving professional to determine the best option for your specific needs.

An asphalt parking lot typically consists of four layers:
1. Subgrade: The native soil that is compacted to provide a stable foundation.
2. Subbase: A layer of crushed stone or gravel placed on top of the subgrade for additional support
and drainage.
3. Base Course: A thicker layer of aggregate that adds strength and stability.
4. Asphalt Surface: The top layer of asphalt mix that provides a smooth, durable, and weather-
resistant surface.

The best surface for a parking lot is asphalt. It provides a durable, cost-effective, and easy-to-maintain
option that withstands various weather conditions and heavy traffic. For areas with extreme
temperatures or heavy loads, reinforced concrete can be an alternative due to its higher durability and
strength.

Parking paving typically uses asphalt or concrete due to their durability, cost-effectiveness, and ease of
maintenance. Asphalt offers flexibility and quick installation, while concrete provides longevity and
strength.

Parking paver blocks are typically 60mm to 80mm thick, depending on the specific design
requirements and intended load capacity.

Contact Us

We are always available to help you out. Whether it’s a support issue, a question about a product of ours, or any other query, we are here to respond to your request.